Recent jobs
Our own photos from site, in the order the work was done: rising damp, a failed DPC, a basement, a floor and a re-plaster.
Seq A
Rising damp

01Before: the tide mark 
02Stripped back to brick 
03Re-rendered 
04Finished: new plaster and skirting
Seq B
Failed DPC (someone else’s work)

01Before 
02Put right
Seq C
Cavity drain membrane installation

01Membrane on walls and floor 
02Floor laid
Seq D
Decayed flooring

01Floor up: the decay 
02New joists going in 
03New floor boarded
Seq E
Re-plastered

01After damp treatment
Next step
Get someone round to look.
Request a survey, or call us on 07500 041243.